Square Feet
2,007
Bedrooms
4
Bathrooms
3
Share this home

The Tahoe with Garage – 2000

floorplans & renderings

features

Light Steel Framing

The structural frame is made of light gauge steel which has both Galvalume and Galvanized corrosion resistance.

Energy Efficient

All models have upgraded insulation making heating and cooling extremely cost effective.

Manufacturer's Warranty

1 year manufacturers limited warranty on all products.

partners

Our Process

Our Custom Home Process

01
Design and Planning
02
Material Preparation
03
Site Preparation
04
Panel Installation
05
Roofing and Exterior Finishes
06
Interior Work
07
Final Inspection
08
Handover and Support
  • Initial Consultation: Meet with clients to understand their needs, preferences, budget,  and deposit schedules.
  • Global Haven Pre-Engineered home plans: Select your Home.
  • Custom Design: Utilize advanced architectural software to create custom home designs, incorporating the LGS wall panel system.
  • Blueprint Approval: Present designs to clients for feedback and approval.
  • Site plan design and engineering: Our team in connection with our engineering partners will work with you on your site plan, permitting, engineering requirements, and approvals. 
  • Approval: Once permits and required approvals are in place we will start your new home. 

Panels: Pre-assemble LGS wall panels in a controlled factory environment, including:

  • Pre-sheathing
  • Electrical wiring
  • Plumbing installation
  • Insulation application
  • Quality Control: Conduct rigorous quality checks to ensure all panels exceeding industry standards.
  • Land Clearing: Clear the construction site and prepare the foundation.
  • Foundation Installation: Helical Pier ( Usually less than one day)
  • Delivery of Panels: Transport the pre-assembled panels to the construction site.
  • Structural Assembly: Efficiently erect the wall panels using cranes or specialized equipment, reducing construction time significantly.
  • Connection of Utilities: Connect electrical and plumbing systems to the main infrastructure.
  • Roof Installation: Complete roofing using durable materials that complement the LGS structure.
  • Exterior Finishing: Apply siding, stonework, or other finishes to enhance curb appeal and weather resistance.
  • Proprietary Interior wall panel installation : saves time by not requiring, tape, texture or paint.
  • Finishing Touches: Install flooring, and add fixtures like cabinets, plumbing and light fixtures, appliances were applicable.
  • Quality Assurance: Conduct a thorough inspection of the entire structure to ensure compliance with building codes and client specifications.
  • Client Walkthrough: Invite clients for a final walkthrough to address any concerns or adjustments.
  • Project Handover: Officially hand over the keys to the client, providing them with documentation and warranty information.
  •  Post-Construction Support: Offer ongoing support and maintenance services as needed.

other home options

Start typing and press Enter to search

Shopping Cart

No products in the cart.